99精品国产一区,久久天堂一区二区三区,亚洲国产精品久久久久,亚洲播放一区,国产99久久99热这里精品5,99久久久国产精品,九九免费精品

中文

Release date:

08Month19Day,2024Year

Star Arrow Technology (Xi'an) Co., Ltd. electroplating second phase production project Environmental Impact Report Exposure Draft Public Notice

According to the “Environmental Impact Assessment Law of the People's Republic of China” and “Measures for Public Participation in Environmental Impact Assessment”, the Environmental Impact Report of “Star Arrow Technology (Xi'an) Co., Ltd. Electroplating Phase II Production Project” has been entrusted to Xi'an Luda Environmental Protection Science and Technology Co.

I. Ways and means of checking the electronic version and paper report (public notice)

1、Electronic version of the draft environmental impact report for comments to obtain the link:

Link: https://pan.baidu.com/s/1ByY1bABbC5xN9OUlUnKvKw Extract code: muw2

2. Access to paper version of the report: the public can obtain information about the project from the EIA unit and the construction unit within 10 working days after the release of this announcement, and the contact information of the EIA unit and the construction unit can be found in the following:

EIA Unit: Xi'an Luda Environmental Protection Technology Co.

Contact person: Mr. Jiang Tel: 15737938503 E-mail: xaluda@126.com

Construction unit: Star Arrow Technology (Xi'an) Co.

Contact: Mr. Peng Tel: 13700273135 E-mail: 13700273135@163.com

II. Scope of Public Consultation

The scope of the object of consultation is mainly for the residents and other stakeholders around the Equipment Manufacturing Surface Treatment Center, No. 111 Qingyi Road, National Aviation High-Tech Industrial Base, Yanliang District, Xi'an City, China, and the community is welcome to express their opinions and suggestions on the environmental protection work of the project.

Web link to the public comment form

The public comment form can be found in the document of the Ministry of Ecology and Environmental Protection, “Announcement on the Release of Supporting Documents for the Measures for Public Participation in Environmental Impact Evaluation” (No. 48, 2018) at http://t.cn/EyMN8gp.

IV. Ways and means of public comments

The public can consult and put forward relevant comments and suggestions to the EIA preparation unit or construction unit by telephone, letter or e-mail after the relevant information is made public.

V. Starting and ending time for public comments

Within 10 working days from the date of public announcement.

?

?

?

Star Arrow Technology (Xi'an) Co.

August 19, 2024

齐齐哈尔市| 从江县| 石楼县| 扶风县| 军事| 新营市| 维西| 昌江| 许昌市| 巩义市| 保德县| 西吉县| 鲜城| 双桥区| 宁蒗| 昌吉市| 温宿县| 会理县| 勐海县| 通许县| 凌源市| 天全县| 金溪县| 灵石县| 宁夏| 安仁县| 泰兴市| 杂多县| 遵义市| 泸溪县| 仙居县| 南丹县| 吴堡县| 博野县| 旅游| 全椒县| 文安县| 汤原县| 独山县| 军事| 综艺|